Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

PSE Wind Facilities Each Reach Million MWh Milestone

Puget Sound Energy's Hopkins Ridge and Wild Horse wind facilities have both reached a milestone, with each facility now having produced more than 1 million MWh of clean, renewable electricity since entering service in 2005 and 2006, respectively.

“Wind energy is now a proven performer for meeting our customers’ growing demand,” said Kimberly Harris, executive vice president and chief resource officer for PSE. “Not long ago, wind power was only a concept. Today, it is a clean, renewable resource for helping combat climate change.”

PSE is the largest utility generator of renewable energy in the Northwest, with its two wind facilities producing enough electricity, on average, to meet the equivalent of the needs of approximately 100,000 homes. PSE owns and operates the Hopkins Ridge Wind Facility in Columbia County, Washington, and the Wild Horse Wind Facility in Kittitas County, Washington.

Hopkins Ridge, near the historic city of Dayton, began operation in November 2005 and has 87 wind turbines with the capacity to produce 150 MW of electricity. It reached the 1 million MWh mark of cumulative energy production on June 3, 2008. Wild Horse, located east of Ellensburg, entered service in December 2006 and has 127 wind turbines with the capacity to produce 229 MW of electricity. It reached the 1 million MWh mark on July 4, 2008. PSE is completing construction on four additional turbines at Hopkins Ridge, and recently announced plans to expand Wild Horse with an additional 26 turbines by late 2009.

“Hopkins Ridge and Wild Horse have exceeded our expectations,” Harris said. “This year, both facilities are producing about 6 percent more electricity than our meteorological and engineering studies had predicted, and have shown themselves to be reliable resources throughout the year.”

In addition to the energy they generated, the two PSE facilities have had a significant economic impact on the local communities near which they operate. Combined, the two facilities have paid more than $3.3 million in state, county and local taxes since going into operation. Each has also generated more than 20 permanent jobs in their home communities and 150 to 250 temporary jobs during construction.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues