Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Tres Amigas Files with FERC for America’s First Renewable Energy Transmission Hub

Tres Amigas, LLC has submitted filings with the Federal Energy Regulatory Commission requesting regulatory approvals needed to move forward with the Tres Amigas SuperStation, America’s first renewable energy transmission hub.

The SuperStation will be located in Clovis, New Mexico and will for the first time provide the capability to transfer thousands of megawatts of power between the three U.S. power grids – or “Interconnections” – known as the Eastern Interconnection, the Western Interconnection and the Texas Interconnection (also known as the Electric Reliability Council of Texas, or ERCOT).

The filings made by Tres Amigas request that FERC:

  • Provide Tres Amigas, LLC with negotiated rate authority over the sale of transmission rights through the SuperStation to allow power to be scheduled between the three U.S. power grids.
  • Preserve the status quo by disclaiming jurisdiction over ERCOT following its connection to the Tres Amigas project.

“Since announcing the Tres Amigas SuperStation in early October 2009, interest in and support for the project has been simply overwhelming,” said Tres Amigas, LLC Chief Executive Officer Phil Harris. “The need for new transmission to take America’s renewable energy from its point of generation in remote areas to where it is needed most is self evident. By enabling the exchange of wind, solar and geothermal power between all three grids, the Tres Amigas SuperStation will help break our nation’s transmission bottleneck. We believe the merits of this project and the benefits it will provide to the U.S. warrant FERC approval.”

Similar to highway rotaries or roundabouts used for traffic flow control, multiple power transmission lines from each of the Interconnections will feed power into and out of the Tres Amigas SuperStation through Superconductor Electricity Pipelines. Tres Amigas will help ensure the efficient and reliable flow of power from multiple generation sources in all three power grids to customers across a wide area of the U.S.

“The United States is embarking on an aggressive renewable energy plan, yet we lack a national transmission backbone to support our vision,” U.S. Senator Jeff Bingaman stated. “By tying the nation’s three power grids together, the Tres Amigas station will catalyze the adoption of renewable power while at the same time increasing the reliability of our electricity network, which is fundamental to the expansion of the U.S. economy.”

The Tres Amigas project has received strong endorsements from the state of New Mexico and key industry stakeholders. Following FERC approval, the company will begin negotiating with transmission companies that would like to connect to the SuperStation. Tres Amigas currently has letters of intent with four transmission companies and is in discussions with others. The project is expected to be completed and operational by the end of 2014.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues