Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

How NERC CIP and Security Issues Impact Substation Design and Deployment

Read this whitepaper to learn about a variety of security strategies that can be implemented today and how they will enable you to respond to evolving security requirements

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

AutoCAD Map 3D and Autodesk MapGuide Enterprise:

Powerful, Affordable, Open GIS - With open data standards, CAD integration, and a shared API, AutoCAD® Map 3D and Autodesk MapGuide® Enterprise software products streamline workflows and maximize the value of geospatial data seamlessly-from the desktop to the Web.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

Wind Energy Could Produce 20 Percent of U.S. Electricity By 2030

The U.S Department of Energy (DOE) has released a first-of-its kind report that examines the technical feasibility of harnessing wind power to provide up to 20 percent of the nation’s total electricity needs by 2030. Entitled “20 Percent Wind Energy by 2030,” the report identifies requirements to achieve this goal including reducing the cost of wind technologies, citing new transmission infrastructure, and enhancing domestic manufacturing capability.

Most notably, the report identifies opportunities for 7.6 cumulative gigatons of CO2 to be avoided by 2030, saving 825 million metric tons in 2030 and every year thereafter if wind energy achieves 20 percent of the nation’s electricity mix. As part of President Bush’s Advanced Energy Initiative announced in 2006, clean, secure and sustainable wind energy has the potential to play an increasingly important role in the Bush Administration’s long-term energy strategy to make investments today to fundamentally change the way we power U.S. homes and businesses and to help reduce greenhouse gas emissions growth by 2025.

“DOE’s wind report is a thorough look at America’s wind resource, its industrial capabilities, and future energy prices, and confirms the viability and commercial maturity of wind as a major contributor to America’s energy needs, now and in the future,” DOE Assistant Secretary of Energy Efficiency and Renewable Energy for the U.S. Department of Energy Andy Karsner, said. “To dramatically reduce greenhouse gas emissions and enhance our energy security, clean power generation at the gigawatt-scale will be necessary, and will require us to take a comprehensive approach to scaling renewable wind power, streamlining siting and permitting processes, and expanding the domestic wind manufacturing base.”

Prepared by the U.S. Department of Energy and a broad cross section of stakeholders across industry, government, and three of DOE’s national laboratories - the National Renewable Energy Laboratory in Golden, CO; Lawrence Berkeley National Laboratory in Berkeley, CA; and Sandia National Laboratory in Albuquerque, NM, the report presents an in-depth analysis of the potential for wind in the U.S. and outlines a potential scenario to boost wind electric generation from its current production of 16.8 gigawatts (GW) to 304 GW by 2030. For its technical report, DOE also drew on the expertise of the American Wind Energy Association and Black and Veatch engineering consultants and the report reflects input from more than fifty energy organizations and corporations.

The analysis concludes that reaching 20 percent wind energy will require enhanced transmission infrastructure, streamlined siting and permitting regimes, improved reliability and operability of wind systems, and increased U.S. wind manufacturing capacity. Highlights of the report include:

  1. Annual installations need to increase more than threefold. Achieving 20 percent wind will require the number of annual turbine installations to increase from approximately 2000 in 2006 to almost 7000 in 2017.
  2. Costs of integrating intermittent wind power into the grid are modest. 20 percent wind can be reliably integrated into the grid for less than 0.5 cents per kWh.
  3. No material constraints currently exist. Although demand for copper, fiberglass and other raw materials will increase, achieving 20 percent wind is not limited by the availability of raw materials.
  4. Transmission challenges need to be addressed. Issues related to siting and cost allocation of new transmission lines to access the Nation’s best wind resources will need to be resolved in order to achieve 20 percent wind.

“The report correctly highlights that greater penetration of renewable sources of energy - such as wind - into our electric grid will have to be paired with not only advanced integration technologies but also new transmission,” DOE’s Assistant Secretary for Electricity Delivery and Energy Reliability Kevin Kolevar said. “In many cases, the most robust sources of renewable resources are located in remote areas, and if we want to be able to deliver these new clean and abundant sources of energy to population centers, we will need additional transmission.”

With the U.S. leading the world in new wind installations and having the potential to be the world leader in total wind capacity by 2010, DOE’s report comes at an important time in wind development. Last year, U.S. cumulative wind energy capacity reached 16,818 megawatts (MW) – with more than 5,000 MW of wind installed in 2007. Wind contributed to more than 30 percent of the new U.S. generation capacity in 2007, making it the second largest source of new power generation in the nation --- surpassed only by natural gas. The U.S. wind energy industry invested approximately $9 billion in new generating capacity in 2007, and has experienced a 30 percent annual growth rate in the last 5 years.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Gene Wolf

IEEE Blog

IEEE PES
Gene Wolf

Thousands of attendees and exhibitors are poised to take part in the biggest event of the electric utility industry, the 2008 IEEE PES Transmission and Distribution Conference and Exposition hosted by ComEd in Chicago. The IEEE Blog is a unique tour of the 2008 PES Expo, updated regularly by Gene Wolf, chairman of the IEEE PES T&D Committee.

Read More

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

Jobzone
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue
  • December Issue

Browse Back Issues