T&D How

BPA Install of Transmission Line: Framing

Discuss this Video 1

TD (not verified)
on Dec 22, 2016

It sure looks like those cross arm and strap bolts extend further than 2" beyond the nut....

Post new comment
or register to use your TDWorld ID
Connect

Latest News
Feb 16, 2017
Video
T&D How

Temporary Extension Arm Installation

As part of a distribution line changeout, National Grid installs a temporary extension arm onto an existing pole...More
Latest on T&D How™

Feb 16, 2017
Video
T&D How

Temporary Extension Arm Installation

As part of a distribution line changeout, National Grid installs a temporary extension arm onto an existing pole...More
Jan 29, 2017
Video
T&D How

Distribution Pole Installation

A National Grid crew installs a wooden distribution pole on Main Street in Uxbridge, Massachusetts....More
Jan 29, 2017
Video
T&D How

Primary Conductor Removal 1

In preparation for undergrounding, a National Grid crew de-energizes part of a distribution line....More
Dec 18, 2016
Video
T&D How

Drone Site Inspection 1

An unmanned aerial vehicle (drone) is used to do a site survey at an SDG&E battery bank installation....More

Transmission & Distribution World Online Buyers' Guide
Featured Jobs

More Jobs >>

Sponsored Introduction Continue on to (or wait seconds) ×