BPA Install of Transmission Line: Hole Digging

Discuss this Video 1

on Dec 6, 2016

After the blasting activities are completed, how are the native soil conditions determined so that the H-Frames foundation can be calculated / determined? I would think that the blasting activities would significantly "disturb" the remaining native soil into a condition that would be difficult to determine for the H-FAD design and / or other foundation calculations.
Thanks for the video...
RalphieAdams@APS.com

Post new comment
or register to use your TDWorld ID
Connect

Latest News
Latest on T&D How™

Dec 18, 2016
Video
T&D How

Drone Site Inspection 1

An unmanned aerial vehicle (drone) is used to do a site survey at an SDG&E battery bank installation....More
Dec 18, 2016
Video
T&D How

Water Filtration Sleeve

SDG&E crews use a high-capacity hydraulic pump with a filter sleeve to de-water a manhole....More
Dec 18, 2016
Video
T&D How

Composite Pole Assembly

A 45-foot fiberglass composite distribution pole is assembled in the SDG&E Training Yard....More
Dec 5, 2016
Video
T&D How

BPA Install of Transmission Line: Framing 1

A crew frames up an H-Frame 115kV transmission line pole in eastern Washington...More

Transmission & Distribution World Online Buyers' Guide
Featured Jobs

More Jobs >>

Sponsored Introduction Continue on to (or wait seconds) ×