T&D How

Helicopter Install of Transmission Line Monitor

Discuss this Video 1

on Oct 28, 2016

I was surprised that none of the tools used in the video seemed to be tethered in any way.

Post new comment
or register to use your TDWorld ID
Connect

Latest News
Latest on T&D How™

Feb 16, 2017
Video
T&D How

Temporary Extension Arm Installation

As part of a distribution line changeout, National Grid installs a temporary extension arm onto an existing pole...More
Jan 29, 2017
Video
T&D How

Distribution Pole Installation 1

A National Grid crew installs a wooden distribution pole on Main Street in Uxbridge, Massachusetts....More
Jan 29, 2017
Video
T&D How

Primary Conductor Removal 1

In preparation for undergrounding, a National Grid crew de-energizes part of a distribution line....More
Dec 18, 2016
Video
T&D How

Drone Site Inspection 1

An unmanned aerial vehicle (drone) is used to do a site survey at an SDG&E battery bank installation....More

Transmission & Distribution World Online Buyers' Guide
Featured Jobs

More Jobs >>

Sponsored Introduction Continue on to (or wait seconds) ×