Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Control Innovation Creates Spinning Reserve Capacity in California

Connected Energy Corp has been selected to participate in a project funded by the California Energy Commission in cooperation with the Consortium for Electric Reliability Technologies (CERTS), based at Berkeley National Laboratory, Southern California Edison (SCE), and the California Independent System Operator (CAISO).

The project, called the Demand Response Spinning Reserve Demonstration, will provide new and powerful capability in California to match demand to available power. Spinning Reserve is an industry term for generation that can be immediately brought on line to meet rapid increases in power demand due to a variety of circumstances including severe weather or supply system constraint.

In this project, rather than adding new electricity production to the grid to meet spiking demand for electricity, a real-time remote management system connecting a number of non-essential electricity loads will enable the grid operator to remotely turn them off in response to system signals. This will result in new capacity at times when high demand for electricity jeopardizes grid stability, creating rolling blackouts or other interruptions in service. The project intends to assert that the ability to react in real-time to system conditions and turn off loads is just as effective a mechanism, with the added benefit of reducing stress on transmission and distribution assets and avoiding the environmental impact of producing more electricity.

The technology solution that will enable this project comes from Connected Energy Corp of Rochester, New York, a company that has been pioneering real-time Internet command and control of distributed energy assets for over 10 years.

"Our solution does for a system operator what a cockpit does for a car driver," stated Connected Energy Corp President and CEO Christopher Campbell. "We present the operator with three critical components; a real-time dashboard of operating parameters; windows to see what's going on externally; and the controls to take action. In the context of this initiative, we provide the aggregated real-time monitoring of electricity flow and the secure sharing of feeder data to support control decisions. The system capabilities allow an ISO or other operator to supervise grid resources individually or as a group, from anywhere, in real-time, as simply as if the operator was sitting at the controls of one large piece of equipment."

Campbell went on to say that the electricity industry has a vision for the future of energy production firmly rooted in the distributed generation model and the company's fully managed solution provides the platform for this new supply side paradigm to be implemented on a large scale. The system also provides instantaneous feedback, verifying exactly how much load has been taken off line and the impact on the grid for the corresponding action. Utilities have been implementing conventional demand response programs for several years but have struggled with verification and measurement as a result of their dependency on historical information and analysis after-the-fact to determine the impact. Electricity, unlike other resources is produced and consumed in real-time. This project will demonstrate how important real-time information can be for managing the grid.

The project will solicit larger energy users to make available certain loads to be controlled for the program and in return, will receive a variety of incentives. The results of the program will provide insights about how this type of solution can improve grid reliability/stability.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues