Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Siemens to Deliver Power System Control for Russian Extra-High Voltage Power System

Siemens Power Transmission and Distribution (PTD) is to supply state-of-the-art power system control to equip Russia’s extra-high voltage power system. In this way, the System Operator-Central Dispatching Office for Unified Energy System of Russia (SO-CDU UES) is responding to the requirements of the deregulated Russian energy market. The new Siemens system will replace the existing systems and will add new functions.The use of the new system guarantees higher operating reliability of all equipment, a reduction of overall network losses and improved utilization of power plant capacity. The order has a value of about 80 million euros; commissioning is planned for the middle to end of 2008.

Russia is not only the world’s largest country in terms of surface area. It also has one of the largest and most complex power networks in the world with correspondingly high requirements as regards data volume and the efficiency of the power system control. The complete system for the Russian 220-kV and 500-kV extra-high voltage system to be delivered by Siemens consists of the central power system control center in Moscow and seven supraregional control centers distributed across the whole of Russia. Two of these supraregional control centers are configured as backup control centers for the central power system control center.

The power system control, which is based on the latest Advanced-PowerCC architecture, provides the necessary SCADA/EMS/EMM functions for real-time monitoring of the entire extra-high voltage network. Furthermore, the system provides all interfaces and programs for data exchange with the operator of the power trading system and all other market players such as distribution companies, producers and qualified users.

The system operates with open standards such as the IEC 61970 standard for the CIM data model and the relevant program interfaces and with IEC 60870-5 and IEC 60870-6 for communication and data exchange with other systems. In this new project for Russia all data relating to the extra-high voltage network will also be gathered centrally in the internationally standardized CIM format for the first time. These standards create the basis for expansions such as are to be expected in an increasingly deregulated energy market. Siemens is making allowance for the specific requirements of the Russian market model for the deregulated energy market with energy management functions (EMS) and energy market management functions (EMM) matched specifically to the stipulations of the Russian market regulations.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues