Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Vermont Electric Power to Install Four Synchronous Condensers

In the first project of its kind in the New England area in more than 30 years, Vermont Electric Power Company (VELCO) has chosen GE Energy to install four synchronous condensers at its Granite substation located in Williamstown, Vermont.

VELCO will be using the synchronous condensers to provide both steady state and dynamic support (VAR and voltage control) to the critical transmission corridor located in and around the Granite substation. The addition of the condensers will help to improve the system's efficiency and reliability, allowing VELCO to meet growing customer demand on the transmission grid in this area. The condensers and excitation systems are designed to provide low-voltage ride-through capability for 115 kV or 230 kV faults to aid in overall system stability.

The four condensers form the core of the Granite reactive power device, a system designed to maximize the available dynamic range of the condensers by coordinating condenser operation with 115-kV shunt capacitor banks and two autotransformer tap changers.

"VELCO selected our synchronous condensers because the turnkey solution was able to meet its strict specification requirements for fault performance as well as facilitate control compatibility with nearby HVDC and STATCOM installations," said Dan Heintzelman, president of GE Energy's services business.

"When the Northwest Reliability Project is complete, the Granite substation will be one of our most important stations for supporting network reliability and our new synchronous condenser installation will provide vital reactive power support for the New England transmission grid," said John Donleavy, president and CEO, VELCO.

GE Energy's units are each nominally rated at +25/-12.5 MVAR, for a total of +100/-50 MVAR. Each machine will be controlled with a state-of-the-art excitation system consisting of GE's EX2100* digital control and brushless exciter. Also included under the terms of the contract is a joint VAR controller that will coordinate both 230 kV tap changers, four 115 kV shunt capacitor banks and the voltage reference for each condenser's automatic voltage regulator. It will do so while maintaining 115 kV and 230 kV voltages within desired limits. The condensers are scheduled for commercial operation at the end of 2007.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues