Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Beacon Power Completes Critical Testing of Smart Energy 25 Flywheel System

Beacon Power Corp. has successfully completed all critical performance tests on the Smart Energy 25 flywheel, and is moving forward to order the remaining materials necessary to build its first 10 commercial flywheel units.

The critical tests that the flywheel passed included "lift-circuit failure testing." This involved powering the Smart Energy 25 system up to different speeds, including its top speed of 16,000 rpm, and disabling power to the magnetic system that lifts the spinning flywheel within its vacuum-sealed container. The hardware components that Beacon redesigned following a test malfunction in December 2006 were successful in bringing the flywheel to a full and safe stop. Other tests confirmed projected performance of the flywheel, including high efficiency operation and availability of its rated 25 kWh of stored energy.

"This is a tremendous accomplishment by our engineering team, representing thousands of hours of design, development and testing," said Bill Capp, Beacon president and CEO. "With this important safety milestone successfully completed and our redesign thus validated, we are moving ahead to build our first commercial units. We expect these initial Smart Energy 25 systems to be running in our new manufacturing plant in Tyngsboro, Massachusetts, by the end of January 2008, before being grid-connected at our first commercial frequency regulation facility in April 2008."

Last month the company announced that the Smart Energy 25 had achieved the performance benchmarks of full speed (16,000 rpm) and full power (100 kilowatts charging and discharging), and that it had begun ordering some long lead-time components. The company is also qualifying multiple suppliers for key system components and continues to work to optimize the manufacturing cost of the system.

In related news, Beacon has finalized and is implementing plans to move its Massachusetts-based headquarters facility from Wilmington to a larger space in Tyngsboro. The Company has signed a 60-day extension of its current lease through November 2007, to allow a smoother transition from one location to the other. "We intend to make this move during the first half of November, without any significant interruption to flywheel development or manufacturing schedules," added Capp.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues