Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Beacon Power to Provide Flywheel System to Support Wind Power Integration Project in California

Beacon Power Corp. has been awarded a subcontract to provide a flywheel energy storage system in support of a wind integration R&D project sponsored by the California Energy Commission. Beacon will receive approximately $250,000 to offset R&D expenses and will contribute an additional $90,000 of engineering resources for the project, bringing the R&D total to approximately $340,000.

In addition to the California Energy Commission, which is funding the project, other leading stakeholders include Southern California Edison and the California Independent System Operator (ISO). The flywheel system will be installed in Tehachapi, California, a high-potential wind resource area where, according to a report from the California ISO, up to 4,200 MW of wind power may be added in the coming years.

In its November 2007 report entitled Integration of Renewable Resources, the California ISO forecasted the need for hundreds of megawatts of additional frequency regulation capacity due to the impact of increasing wind deployment and its associated intermittency. Frequency regulation is a service that balances electricity supply and demand to maintain grid stability. Beacon Powers regulation plants can address this need, and Beacon has already successfully demonstrated this capability in California.

In addition to highlighting the use of energy storage for frequency regulation, the report outlines other changes that will be required on the California grid to achieve the states goal of 20% renewable energy by 2010. These include the need to address transmission constraints. Beacons flywheel energy storage systems may also have the potential to address shortages in transmission line capacity, which this wind power integration project is intended to prove.

The primary goal of the project is to demonstrate that advanced control technology with energy storage can help expand the delivery of renewable wind energy by effectively increasing the capacity of constrained transmission facilities in the Tehachapi area. This project supports Californias goal to upgrade and expand its electricity transmission and distribution infrastructure per the states Energy Action Plan of 2003.

As a key subcontractor on the project, Beacon Power will work with the prime contractor, Alternative Energy Systems Consulting, and be responsible for implementing the energy storage portion of a system that:

  • Uses flywheel technology to improve the dynamic control of wind generation resources;
  • Coordinates energy production and delivery from wind generation in the Tehachapi region, and;
  • Demonstrates that such a system could expand the potential delivery of renewable energy and increase the capacity and use of transmission facilities in California.

The flywheel system used for the project will be the reconditioned scale-power Smart Energy Matrix that Beacon provided to the California Energy Commission in 2005-2007 to successfully demonstrate frequency regulation performance.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues