Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Pulseclosing Saves Transformers From the Stress of Damaging Fault Current

A major benefit of S&C’s IntelliRupter PulseCloser — PulseClosing Technology — was recently demonstrated at Murfreesboro Electric Department, the electric utility serving customers in Murfreesboro, Tennessee.

In July, an IntelliRupter on the department's system tripped upon sensing a 2700-A phase-to-phase fault. After a 0.3-second delay, the IntelliRupter then pulseclosed to verify that the line was clear of faults before initiating a closing operation. Fault current was indeed still detected on one phase . . . so IntelliRupter did not close.

By contrast, a conventional recloser would have closed in this instance. The substation transformer, conductor splices, and other equipment would have been subjected to damaging fault current until the recloser decided to open again. And upstream customers would have been subjected to another irritating voltage sag in the interim. The consequences would have been magnified if multiple reclosing attempts were necessary.

After a 15-second delay, IntelliRupter again pulseclosed. But no fault current was detected this time, so IntelliRupter closed, restoring service to downstream customers.

Pulseclosing reduces the wear and tear on power system equipment by saving it from the repeated stress of fault current. It extends the life of costly assets, helping to defer the need for replacement equipment. By cutting let-through energy, pulseclosing greatly reduces the risk of fire in dry areas too.

IntelliRupter is fully compatible with S&C’s IntelliTEAM II Automatic Restoration System. This self-healing, scalable feeder reconfiguration system is a universal Smart Grid solution.

Nine-channel waveform captured by IntelliRupter, showing 2700-ampere phase-to-phase fault that triggered tripping. After a 0.3-second open interval, pulseclosing still detected fault current, so closing was not initiated. After an additional 15-second delay, pulseclosing detected no fault current, so closing was initiated, restoring service downstream. Source-side voltage — shown in the middle three waveforms — was virtually unaffected by pulseclosing.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues