Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Virginia City Installs High-Reliability Distribution System with Microprocessor-Based Relay Controls

The importance of reliable, high-quality electric power is increasingly being recognized by utility customers. It fosters economic development and enhances the attractiveness of a service area to “new technology” businesses.

For these reasons, the city of Danville, Virginia, sought a high-reliability distribution system to serve a new 330-acre high-technology Cyber Park anchored by the Institute for Advanced Learning and Research and the Regional Center for Applied Technology and Training. Danville had just started an aggressive economic development initiative and wanted to promote a unique set of utility services to differentiate the Cyber Park from other regional parks. Dependable switchgear would be needed, as well as engineering and installation support services. Danville Power & Light (DP&L) owned and operated by the city of Danville, serves approximately 42,000 customers in a 500-square-mile service territory covering portions of a three-county area.

DP&L found the system protection and control provided by S&C’s High-Reliability Distribution System—-featuring S&C Vista Underground Distribution Switchgear with microprocessor-based relay controls—-to be particularly well suited for their application. The engineers, designers, and field service technicians of S&C’s Power Systems Services Division designed, customized, and tested the control scheme, assisted in the installation, performed field checkout, and managed the switchgear development and testing to provide a fully functional protection system.

The main distribution feeder backbone through the Cyber Park and back to the substation forms a closed loop at 12.47 kV. The first feeder segment at each end of the loop runs overhead. The underground feeder through the Cyber Park is divided into segments by Vista UDS Switchgear. For additional redundancy, future plans include provision of alternate feeder.

High-speed fault detection, along with fast response by the Vista UDS fault interrupters, provides rapid fault clearing on the main feeder; faults are isolated before the resulting voltage disturbance can upset the loads. Any segment of the main feeder can be isolated without interrupting power to the loads.

The fault detection employed on the main feeder backbone uses directional overcurrent elements in Permissive Overreaching Transfer Trip (POTT) and Directional Comparison Blocking (DCB) schemes. Multiplexed fiber-optic communication between the relays at either end of a feeder segment is used to confirm fault location and only the interrupters necessary to isolate a fault are tripped. Power to the loads is maintained on unfaulted segments. A total fault clearing time of six cycles (0.100 seconds) or less is attained, so critical loads remain unaffected. Because faults on the overhead segments may be transient in nature, an automatic reclosing sequence is employed on these segments following fault clearing. Switchgear loads are protected by fault interrupters controlled by the Vista Overcurrent Control.

The microprocessor relays interface to DP&L’s SCADA system through the multiplexed communication system. Status points and analogs can be interrogated without an additional remote terminal unit.

Results

A mock-up of the distribution system was assembled and tested in the presence of DP&L engineers at S&C’s John R. Conrad Industrial Complex in Chicago.

The Vista UDS units were connected through multiplexed communication circuits. Spare protective relays were programmed to simulate the substation circuit breakers. A computer-controlled relay test set was used to inject secondary current and voltage in the protective relays to simulate faults at various locations throughout the system. All the protective schemes were tested, and operating times were confirmed to be as expected.

Three Vista units were subsequently installed and startup testing was completed in February 2005. The modular design of the High-Reliability Distribution System readily allows expansion of the protection system and further segmentation of the main feeder if needed to supply additional loads. System expansion is simply a matter of installing additional switchgear at the appropriate location and reconfiguring the communication system to recognize the new gear. In fact, the Institute for Advanced Learning and Research is already expanding its research complex; and two additional industries have the Cyber Park on their short list.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • October Issue
  • September Issue
  • August Issue
  • July Issue
  • June Issue
  • May Issue
  • April Issue

Browse Back Issues