Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

AMSC Begins Fault Current Limiter Project for Southern California Edison

American Superconductor Corp. and Southern California Edison have announced an agreement award from the Department of Energy on a project to develop and perform in-grid testing of a transmission-voltage fault current limiter solution. The FCL will use a design from Siemens AG that incorporates AMSC's proprietary second-generation high-temperature superconductor wires. Fault current limiters act as high-voltage surge protectors for the power grid, increasing system reliability and overall efficiency.

"Superconductor technologies hold great potential for improving the capacity, reliability and efficiency of the nation's transmission grid," said DOE Secretary Samuel W. Bodman. "Fault current limiters are among the most promising of these technologies given their potential to suppress the increasing power surges that are threatening our electrical infrastructure."

As project manager, AMSC will lead the effort to develop a three-phase, 115-kV stand-alone FCL. This FCL will feature a proprietary low-inductance coil technology from project partner Siemens that makes the FCL invisible to the grid until it switches to a resistive state upon the detection of a fault current. The demonstration will occur at a location operated by team member SCE. In addition to Siemens and SCE, AMSC's project partners include Nexans, the University of Houston and Los Alamos National Laboratory.

The project will be conducted in two phases. The first phase will focus on customizing approximately 7,500 meters of AMSC's 2G HTS wire for the FCL application, developing an advanced switching module, designing terminations, and manufacturing and testing a single-phase, transmission-voltage FCL in a laboratory setting. The second phase of the project will focus on manufacturing and testing the three-phase, 115-kV FCL in SCE's grid.

The DOE, through its National Energy Technology Laboratory, is expected to provide AMSC with approximately $3.1 million in federal funding through completion of the first project budget period, expected to end in September 2008. Upon successful completion of key project milestones and sustained execution of a viable business strategy, as much as $9.7 million in additional DOE funding may be made available to AMSC for continued implementation of this five-year project through September 2012, subject to availability of funds appropriated by the U.S. Congress.

Earlier this year, AMSC and Siemens announced they had achieved commercial-grade performance levels for a medium-voltage FCL. The test was conducted on a single-phase, 2 MVA FCL that operated at a voltage of 7.5 kV, which corresponds to a 13-kV class of three-phase power equipment. The FCL suppressed the current during a fault by up to twenty-five times. AMSC and Siemens formed a strategic business alliance in February 2005 to develop HTS fault current limiter technology.

"We are excited to commence work on this project with our international team of business and technology leaders," said AMSC founder and Chief Executive Officer Greg Yurek. "Having achieved commercial-grade success with Siemens on a medium-voltage FCL earlier this year, we are ready to take the next step toward commercialization by developing a transmission-voltage system and demonstrating its advanced capabilities in Southern California Edison's grid. We continue to view stand-alone fault current limiters as one of the largest potential market opportunities for our AMSC Superconductors business."

AMSC's manufacturing process enables it to rapidly customize the dimension, lamination and current carrying capacity for its 2G HTS wire to suit a broad array of applications. High temperature superconductor materials are "smart" because they possess unique physical properties that allow them to conduct electricity with no resistance under normal operating conditions, while also being able to recognize and then instantaneously suppress large surges of electrical current by switching to the resistive state. Suppressing spikes of electrical current is important because it prevents blackouts by preventing damage to expensive electrical equipment in power grids.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • October Issue
  • September Issue
  • August Issue
  • July Issue
  • June Issue
  • May Issue
  • April Issue

Browse Back Issues