Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

How NERC CIP and Security Issues Impact Substation Design and Deployment

Read this whitepaper to learn about a variety of security strategies that can be implemented today and how they will enable you to respond to evolving security requirements

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

BC Transmission to Deploy 3M ACCR in Cross-Water Upgrade for Vancouver Island

BC Transmission Corporation (BCTC), the transmission system operator for the province of British Columbia, will install 3M’s lightweight, high-capacity electricity conductor, 3M Aluminum Conductor Composite Reinforced (ACCR). ACCR can carry twice the current of conventional steel-core conductors of the same diameter, without requiring larger towers, even across long spans.

BCTC will deploy ACCR in two cross-water segments through islands in the Straight of Georgia as part of an upgrade for a transmission line linking Vancouver Island with British Columbia’s lower mainland. The upgrade is known as the Vancouver Island Transmission Reinforcement (VITR) Project.

The 3M ACCR segments, which include a 5,800-foot (1,770-meter) single-span crossing the Sansum Channel between Vancouver Island and Salt Spring Island, in addition to a 6,000-foot (1,830-meter) multi-span crossing, are located about 25 miles north of Victoria, the provincial capital. The installation is currently in progress and scheduled to be completed in June 2008.

According to Tim Koenig, director of the 3M High Capacity Conductor Program, 3M ACCR was chosen, in part, to permit the re-use of existing towers, and avoid potential environmental sensitivities and costs associated with building larger towers for the conventional ACSR conductors.

“Larger towers to accommodate double bundling, for example, would have required bringing heavy equipment into remote areas, some by barge, installing new foundations and guide wires, installing new towers, digging out the existing footings and then transporting the aggregate for an additional 24 towers,” says Koenig. “Moreover, one of the segments goes through part of a provincial park. The existing sightline and minimizing installation requirements are definitely pluses.”

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Amy Fischbach

The Briefing Room


Amy Fischbach

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

More Blogs

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • July Issue
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue

Browse Back Issues