Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

AutoCAD Map 3D and Autodesk MapGuide Enterprise:

Powerful, Affordable, Open GIS - With open data standards, CAD integration, and a shared API, AutoCAD® Map 3D and Autodesk MapGuide® Enterprise software products streamline workflows and maximize the value of geospatial data seamlessly-from the desktop to the Web.

Designing Energy Services for Commercial and Industrial Customers:

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging.

More White Papers

Myrtle Beach Goes Underground 

In Myrtle Beach, South Carolina, U.S., Santee Cooper is participating in a 20-year program to convert all “entry district” and “beach road district” overhead utilities to underground vaults and enclosures...

ASP Installs Switchgear Box Pads 

Utilities are discovering that switchgear box pads made of polymer concrete are easier to install, stronger and last longer than traditional concrete...

Manitoba Hydro Installs 1100 km of Optical Cable 

Manitoba Hydro is a CrownCorp. of the province of Manitoba, Canada. It provides electric energy and natural gas service throughout Manitoba. The company...

Singapore: Power Transmission Network Gets a Boost 

Comergy Ltd., a subsidiary of Pirelli Energy Cables and Systems, has been chosen by the Singaporean power utility SP PowerAssets Ltd. to supply and install...

Massachusetts Siting Board Issues Draft Decision Approving Request for Major Underground Transmission Line 

Clearing the way for a pivotal upgrade to New England's critical electric infrastructure, the Massachusetts Energy Facilities Siting Board tentatively approved NSTAR's request to build a new, 18-mile underground transmission line...

Preparing for Winter Underground Work 

As utilities prepare for winter, one thing is certain: Underground work can be wet and messy. NYSEG URD crews often are faced with new extension projects...

SRP Enhances Reliability of Underground Distribution Cable 

Salt River Project (SRP) has been using cable injection technology to treat crosslinked polyethylene (XLPE) cables since 1998, during which time more...

Underwater Cables Cross Strait and Sound 

The installation of high-voltage cables presents a utility with many challenges. These challenges increase when the project involves an ocean crossing...

AIL Elettricit Re-Vamps its Fault-Location Concept 

Vamp Ltd. (Vassa, Finland) has delivered the VAMP 255 Feeder Manager relays for AIL Elettricit's (Lugano, Switzerland) 150/16-kV substations. The Feeder...

Italy/France: Pirelli and Nexans Win Contract in Tunisia 

A consortium formed by Pirelli Energy Cables and Systems and Nexans has been awarded a turnkey contract by Soci Tunisienne de l'Electricit et du Gaz (STEG)...

How Reliable Are Your Secondary UG Circuits? 

In recent years, Public Service Electric & Gas (PSE Newark, New Jersey, U.S.) has installed an average of 1.5 million ft (457 km) of secondary cable per...

Superseal: Repairing the Future of Secondary Underground Cables 

A recent survey of 25 U.S. utilities, each installing more than 1 million ft (305 km) of underground secondary cable per year, showed that the average...

United Illuminating Locates Cable Route Using Remote Sensing 

United Illuminating Co. (UI; Shelton, Connecticut, U.S.) was looking for ways to extract extra capacity from an existing pipe-type cable circuit. With...

Resume #64 - Objective: Electrical Engineer in transmission and distribution systems (overhead lines, underground cables and substations) using my experience and skills to contribute to company’s success. 

Resume #64...

Distribution Feeder Crosses The San Leandro Channel 

Environmental regulations and opposition from property owners makes expanding underground infrastructures in densely populated urban areas increasingly...

Sweden/Denmark: ALSTOM Wins Contract For Undersea HVDC Link 

ALSTOM has won a contract to increase the capacity of the Konti-Skan high-voltage direct current (HVDC) undersea transmission system between Sweden and...

Utilities Evaluate 600-V Self-Sealing Cable for Cost and Maintenance Benefits 

Utilities are sharply focused on reducing maintenance costs and improving reliability. For years, the underground aluminum 600-V cables feeding street...

Distribution Operations Supervisors, Underground and Overhead Lines - MA 

Massachusetts Electric Company, a National Grid Co., currently has openings for Electric Distribution Operation Supervisors in both their Underground...

*Resume #34 (Objective: Construction Management position for Overhead Transmission lines , Substations and Underground Cables installation projects) 

Objective Construction Management position for Overhead Transmission lines, Substations and Underground Cables installation projects Education Bachelor’s...

Electromagnetic Simulation Helps Design Underground Switchgear 

Electromagnetic simulation software played a key role in the design of underground switchgear that saves space and improves safety. In designing a new...

Saving Strokes with Underground Transmission Lines 

Power lines were not what Intell Staley, LLC (Kansas City, Missouri, U.S.) pictured for Staley Farms, a golf community in suburban Kansas City. Unfortunately,...

Siemens Supplies Power Transmission Technology For Submarine Cable Link Across the Bass Strait 

Siemens Power Transmission and Distribution (PTD; Erlangen, Germany) has received an order from Basslink Pty Ltd. to supply (on a turnkey basis) the two...

Underground Cables Need a Proper Burial 

Overhead systems are out in the open, so it is easy to detect and fix design and installation problems. Underground problems, however, are out of sight...

AC Testing of UD Cables, Accessories at Uo with Oscillating Waves 

The OWTS method, developed at Delft University, gently charges the test object using a DC supply and, after a few seconds, the usual service voltage is...

Sensa Provides Fiber-Optic Solution for Detecting Cable Fires 

Power cables in ducts and tunnels may overheat and ignite for a variety of reasons. The impact of the resulting fire can cause serious problems for utility...

Previous | 1 | 2 | 3 | 4 | 5 | Next

Most Read

Community

Blog

Gene Wolf

IEEE Blog

IEEE PES
Gene Wolf

Thousands of attendees and exhibitors are poised to take part in the biggest event of the electric utility industry, the 2008 IEEE PES Transmission and Distribution Conference and Exposition hosted by ComEd in Chicago. The IEEE Blog is a unique tour of the 2008 PES Expo, updated regularly by Gene Wolf, chairman of the IEEE PES T&D Committee.

Read More

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

Jobzone
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue
  • December Issue

Browse Back Issues