Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Nexans to Supply Submarine Power Cable for Sheringham Shoal Offshore Wind Farm

Nexans has been awarded a contract by StatoilHydro ASA, with an estimated value of 24 million euro, to supply the submarine export cables for the Sheringham Shoal Offshore Wind Farm project, located approximately 20 km (12 miles) offshore from Sheringham, on England's north Norfolk coast.

The full execution of the cable contract is subject to offshore development consent from the U.K. government and a final investment decision during the second half of 2008 for the Sheringham Shoal Offshore Wind Farm project.

The contract scope includes engineering, procurement and construction of two 22-km (14-mile) 145-kV XLPE submarine export cables and a spare cable with associated equipment. A fiber-optic cable manufactured at the Nexans site in Rognan also will be included. The power cables will be manufactured at Nexans' factory in Halden, Norway, for delivery in mid-April 2010.

The Sheringham Shoal Wind Farm, covering an area of 35 sq km (14 sq miles), is located in shallow water, averaging a depth of 20 m (66 ft). If sanctioned, the wind farm will be developed with 88 wind turbine generators with a unit rating of 3.6 MW. The turbines will be connected via a network of infield cables to two offshore substations. The total installed generation capacity will be 315 MW and, in an average year, approximately 1.1 TWh of power will be exported to the mainland through the two submarine export cables, which will be connected to the regional distribution network at Salle Substation. Completion and production start-up of the wind farm is planned for third quarter 2011.

The Sheringham Shoal Offshore Wind Farm will be developed by Scira Offshore Energy Ltd., a company established specifically for this development and owned 50% by the Norwegian company StatoilHydro and 50% by the Dutch company Evelope Project, a subsidiary in the Econcern B.V. group.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • October Issue
  • September Issue
  • August Issue
  • July Issue
  • June Issue
  • May Issue
  • April Issue

Browse Back Issues