Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

The Baltics and Nordic Electricity Markets to Get Connected

A major power transmission link between Finland and Estonia was formally launched in April 2005 at a signing ceremony between representatives of ABB and Nordic Energy Link in the Estonian capital Tallinn.

The European Commission approved Estlink on April 27, 2005, granting an exemption that will charge Nordic Energy Link for the cable's construction, rather than adding the costs to the domestic tariffs of the main grids. Prior to that, electricity market regulators in Estonia and Finland approved the exemption.

Estlink, the first interconnection between the Baltics and Nordic electricity markets, forms part of the European Union's plans to expand interconnections in Europe.

Estlink is about 100 km (62 miles) long, 75 km (46.6 miles) of which is underwater cable and the rest of which is underground cable — 9 km (5.6 miles) in Estonia and 20 km (12.4 miles) in Finland. The project will use ABB's high-voltage direct current (HVDC) Light technology to link the 330-kV Harku Substation in Estonia and the 400-kV Espoo Substation in Finland. ABB is committed to delivering the high-end technology in less than 20 months. The project is due to be completed by the end of 2006.

Estlink, which is worth US$110 million for ABB, is designed to supply the Nordic electricity market with electricity generated in the Baltics. An estimated 2 TWh of electricity will be transported via the cable.

The main importance of the project lies in the improved security of electricity supply in the Baltic states. Estlink allows for electricity transit and provides an alternative electricity purchase channel to cover potential deficits in generating capacity.

The partners in the Estlink project are Baltic power utilities Eesti Energia, Latvenergo and Lietuvos Energija, as well as Finland power utilities Pohjolan Voima and Helsinkin Energia.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • October Issue
  • September Issue
  • August Issue
  • July Issue
  • June Issue
  • May Issue
  • April Issue

Browse Back Issues