Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

REE Contracts Nexans for New High-Voltage Submarine Power Link Between Mallorca and Ibiza

Red Eléctrica de España (REE), the operator of the Spanish power system and the owner of the power transmission grid, has awarded Nexans a turnkey contract worth more than 90 million euros to create a new 115-km (71-mile) high-voltage submarine power link between the islands of Mallorca and Ibiza.

This project forms part of the set of investments that REE is making to interconnect the Balearic Islands with the Iberian Peninsula to guarantee and improve the reliability of their electricity supply. This principal goal is to improve energy efficiency and reduce emissions.

Earlier in 2011, REE commissioned the ROMULO project, a 400-MW high-voltage direct-current link between Spain's 400-kV grid and Mallorca, for which Nexans manufactured, supplied and installed 240 km (149 miles) of DC submarine cables. In this new contract, Nexans will extend the connection to Ibiza by constructing a 132-kV AC submarine cable featuring state-of-the-art XLPE insulation. The 100-MW link will establish two world records for both the longest three-core high-voltage AC connection and the deepest, at an installation depth of 750 m (2,460 ft).

The submarine cable will be manufactured at the specialized Nexans facility in Halden, Norway, and will incorporate fiber-optic elements produced at the Rognan facility in Norway. The project will include 24 km (15 miles) of single-core high-voltage land cable from the Nexans factory in Charleroi, Belgium, together with accessories from Nexans Cossonay in Switzerland.

The submarine cable will be buried in the seabed, using the CapJet system and mechanical trenching. Installation and commissioning should take place between 2013 and 2014.

For more information, visit www.nexans.com.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues