Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

AEP Crews Replace Concrete Trench Covers with Fiberglass

Prefabricated concrete cable trench covers, over time, can crack and crumble, which can cause a hazard for station mechanics working in a substation facility. If the covers aren't properly maintained, workers could accidentally fall into a trench and become injured.

To protect its workers, Appalachian Power Co. is replacing some of its aging trench covers with a lightweight utility trench system called Utilicover. The system, which is manufactured by GEF Inc., is half the weight of heavy concrete covers and can be lifted by one person.

Pilot Project

One of the first Utilicover installation jobs was completed at an American Electric Power (AEP) substation in March 2007 in Broadford, Virginia. GEF provided 1,158 covers, each 24 inches wide by 35 inches long, to the site. The field crews experienced immediate benefits of the new cover system. In the course of six-and-a-half days, a three-man crew used only 12 tons of Utilicover panels to replace 70 tons of concrete covers. The project manager stated the Utilicover covers were installed more quickly by hand than the concrete covers could be removed with an excavator.

Ease of Installation

The product is fabricated using fiber-reinforced-polymer (FRP) components manufactured by Strongwell. These components are lightweight, strong, durable, resistant to corrosion and non-conductive. As such, station mechanics can install the FRP cover system quickly and easily, and reverse the process for trench access.

Unlike concrete, the panels are individually adjustable to accommodate inconsistencies in trench width. The typical trench span is 24 inches, and at that span, with a 500-lb point load at mid-panel, deflection is about 1/8 inch, which ensures cover failure is not a concern for pedestrian rating.

Team Effort

To ensure that the covers fit the trench spans properly, AEP worked closely with GEF on dimensional requirements. The utility wanted the covers to fit directly back into the opening, so the field crews explained what they were looking for in the product, and GEF met their specifications.

The station mechanics met with GEF on site and explained what the issues were and how they wanted the lids to work.

Installing the Product

During maintenance or construction projects, the construction crews would have to lift these heavy concrete covers to access the underground trenches at these substations to make necessary repairs or upgrades. This was not only time consuming but it also required a significant amount of lifting that stresses the back. It took two people to lift the lid for access to the cable trench. Now only one station mechanic is needed to remove or place the cover on top of the cable trench.

To install the cover, a mechanic would need to remove one that was failed, cracked or broken, and then discard all of the components. In the past, the field workers would face the possibility of a back sprain when replacing an aging concrete cover with another cover made of concrete. The Utilicover, however, eliminates these ergonomic concerns because the mechanics are installing the new material right back into the same location and the lids are easy to handle, strong and durable.

Because the system is so easy to use, AEP has received positive response from the field workers regarding the new covers. The mechanics think the product is easy to lift and lightweight. By not having to worry about crumbling concrete, they can also have a cleaner looking installation.


Kenneth R. Posey (krposey@aep.com) is supervisor of the station projects engineering design standards for the power engineering section located at American Electric Power, Gahanna, Ohio. Posey is a registered professional engineer.

American Electric Power www.aep.com

Companies mentioned in this article:

Appalachian Power Co. www.appalachianpower.com

GEF Inc. www.gefinc.com

Strongwell www.strongwell.com

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues