Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

ABB Wins $1 Billion Order for Offshore Wind Power Connection to German Power Grid

ABB has won an order worth around $1 billion from the Dutch-German transmission grid operator TenneT to supply a power link connecting offshore North Sea wind farms to the German mainland grid.

This is the largest power transmission order in ABB's history. It will deploy the world’s largest offshore HVDC system with a rating of over 900 MW, keeping electrical losses to less than 1 percent per converter station. The completed link will be capable of supplying more than 1.5 million households with clean wind-generated electricity.

ABB will design, engineer, supply and install the offshore platform, the offshore and onshore converter stations and the land and sea cable systems. ABB's HVDC Light transmission technology will transport power from the 400 MW Gode Wind II and other wind farms to an offshore HVDC converter station, which will transmit the electricity to the onshore HVDC station at Dörpen on the German coast via 135 kilometers of underwater and underground cables. A converter station here will feed electricity into the mainland grid.

ABB’s HVDC Light transmission technology offers environmental benefits such as neutral electromagnetic fields and compact converter stations. It is suitable for connecting remote offshore wind farms to mainland networks and overcoming distance limitations and grid constraints, while ensuring minimal electrical losses and efficient performance. The 320-kV cable voltage capacity in this latest system is the highest level used for HVDC transmission with extruded cables.

Scheduled to be operational in 2015, this offshore network will help to avoid more than three million tons of carbon dioxide emissions per year by replacing fossil-fuel based generation. Germany's installed wind power capacity of over 27 GW presently meets about eight percent of its electricity requirements. Plans are to double that by 2020. This is the third offshore wind connection order for ABB in Germany, following the 800 MW Dolwin1 link awarded last year and previously the BorWin1 project.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues