Siemens Gamesa Receives Firm Order From EDF Renewables-Enbridge-wpd Consortium For 448-MW Offshore Wind Project
Feb. 26, 2021
Installation and commissioning of the Courseulles-sur-Mer project is scheduled for 2024.
Siemens Gamesa Renewable Energy has been awarded the firm order from the EDF Renewables-Enbridge-wpd consortium for the 448-MW Courseulles-sur-Mer offshore wind power project, located 10 km off the Bessin coast.
The wind turbine nacelles and blades for the Courseulles-sur-Mer project are scheduled to be produced at the Siemens Gamesa facility currently under construction in Le Havre.
The 448 MW project will rely upon the technology of the SWT-7.0-154 Direct Drive offshore wind turbine. Installation and commissioning of the Courseulles-sur-Mer project is scheduled for 2024.
Together with the 497-MW Fécamp offshore wind power project signed with the EDF Renewables-Enbridge-wpd consortium in 2020, Siemens Gamesa has now signed firm orders with them for about 1 GW. Siemens Gamesa has an additional firm order in France for the 496-MW Bay of Saint Brieuc offshore wind power plant with Ailes Marines. Siemens Gamesa has also been named preferred supplier for the 496-MW Dieppe le Tréport and 496-MW Yeu Noirmoutier offshore wind projects.
The Siemens Gamesa facility under construction on the Quai Joannès Couvert in the Port of Le Havre will be used to supply Siemens Gamesa offshore wind projects in France and potentially abroad. Start of operation for the plant is scheduled to take place in the first half of 2022.
Voice your opinion!
To join the conversation, and become an exclusive member of T&D World, create an account today!