Elster EnergyAxis® Smart Grid solution powers the advanced metering infrastructure (AMI) system for Fort Collins Utilities' electric and water customers
You will receive a postcard in the mail before the electric meter is scheduled to be changed. Installation takes a few minutes, with a brief interruption in electric service. During the installation, please make sure any sensitive electronic equipment, such as a personal computer, is turned off. Please notify us in advance about any home medical devices or home business needs.
On the day of installation, an installer will knock on your door to let you know the meter will be replaced. If you are not home, the installer will complete the installation and leave a notice to let you know the work was done.
If installation cannot be completed, the installer will leave a notice with rescheduling information.
Water Meter. Following electric meter installation, a water meter device on the exterior of your home will be replaced. At the time of replacement, an installer will knock on your door to let you know the equipment is being updated. You don’t need to be home, but access to the meter device is required. Please unlock gates and restrain dogs or put them inside.
Commercial Customers and Customers with Scheduling Needs. Under normal circumstances, we will install meters as described earlier.
If this process creates concerns for you or your customers, we encourage you to call and schedule electric meter installation.