The National Renewable Energy Laboratory (NREL), Southern California Edison (SCE), Quanta Technology, Satcon, Electrical Distribution Design (EDD), and Clean Power Research (CPR) have teamed together to analyze the impacts of high-penetration levels of photovoltaic (PV) resources interconnected onto the SCE distribution system.

Specifically, SCE will be interconnecting a total of 500 MW of commercial scale PV by 2015 within their service territory through a program approved by the California Public Utility Commission (CPUC). Research efforts under this project include:

  • Development of distribution and PV system models required to evaluate the impacts of high- penetration PV
  • Identification and development of the necessary distribution system studies and analysis appropriate for determining the impacts of high-penetration PV
  • Data collection on study distribution circuits to quantify the impacts of high-penetration PV
  • Development of high-penetration PV impact mitigation strategies in the form of advanced inverter functions to enable high-penetration PV interconnection
  • Lab testing of advanced PV inverter functions
  • Field testing of advanced PV inverter functions.

In the first year of the project, research efforts have focused on (1) identifying the needed PV system models and distribution system analysis tool capability, (2) identifying prospective distribution circuits within the SCE service territory to be studied, (3) understanding the challenges of integrating high-penetration PV levels onto the SCE distribution system, (4) identifying appropriate data acquisition equipment, and (5) investigating the capability of PV inverters to realize advanced inverter functions that may be useful for mitigating high- penetration PV impacts on the SCE distribution system.

Section 2 of this report describes the need for investigating high-penetration PV scenarios on the SCE distribution system. A few of the expected impacts of high-penetration PV are described, and typical distribution system operation is explained. Two study distribution circuits are also identified in this chapter and discussed in terms of the expected PV penetration levels attained as SCE builds out the 500 MW of installed PV within their service territory.

The necessary PV system modeling and distribution system simulation advances are discussed in Section 3. To properly simulate high-penetration PV operation on a distribution circuit, the expected solar resource of a given PV installation needs to be determined. The first part of Section 3 outlines how solar resource data, collected through remote sensing satellites, can be processed and formatted for inclusion in a distribution system modeling tool such as Distributed Engineering Workstation (DEW), CYMDIST, or Synergee. The second part of Section 3 describes the additional functionality required of the distribution system modeling software package itself to properly and effectively evaluate high-penetration PV scenarios....(Read more...)

Discuss this Article 0

Post new comment
Sign In or register to use your TDWorld ID
(optional)
Featured Video

How to do an REA arc flash relay retrofit

You’ve finished your arc flash studies and met your PPE requirements, now it’s time to address your incident energy levels to reduce clearing time in your distribution equipment and create a safer environment for your employees. This video shows you how to retrofit your existing distribution equipment with ABB’s REA arc flash mitigation system. Learn more solutions for aging distribution equipment by downloading the free white paper, Life extensions and safety upgrades for aging distribution equipment.

Featured White Papers

Newsletter Signup

ABB Smart Grid Update

ABB's Gary Rackliffe, Vice President Smart Grid, blogs a North American perspective on smart grid trends and technologies.

» Read More

Watch Presentation