Search
Search
T&D World Live
EnergyTech
Microgrid Knowledge
Utility Analytics Institute
Smart Utility Summit
Buyer's Guide
Job Center
Home
>
Back Issues
>
T&D World
>
August 2022 Structures Supplement
August 2022 Structures Supplement
Lines and Structures
August 2022 Structures Supplement
Subscribe
Digital
Edition
Archives
Renew
Overhead Transmission
If the Shoe Fits: Design of 765-kV Tower Base Plates
Aug. 10, 2022
Traditional assumptions used for base plate and anchor bolt design must be reconsidered for lattice towers.
Overhead Transmission
Are Guyed Towers Cost Effective?
Aug. 5, 2022
Cost and performance do not respect traditional schemes when it comes to advantages.
Overhead Transmission
Structural Materials That Increase Resistance to Wildfires
Aug. 4, 2022
Testing and evaluation is the best way to assure that structures and towers will survive a wildfire.
Overhead Transmission
Getting Back to Normal
Aug. 3, 2022
After two-plus years of virtual meetings, webinars, and virtual conferences, I’ve always felt something was missing.
Overhead Transmission
Long Span Transmission Structures Go 3D
Aug. 1, 2022
Special transmission structures are needed by today’s interconnected power grid.
More content from August 2022 Structures Supplement
aydinmutlu/Getty Images
Opinion
Overhead Transmission
Engineers Don’t Just Think, They Know
July 19, 2022
There are a lot of companies outside of our industry that see the opportunities and are offering solutions when they don’t know a thing about the subject matter.