• Home >
  • Back Issues >
  • T&D World >
  • August 2022 Structures Supplement
  • August 2022 Structures Supplement

    Lines and Structures
    Four bolt base plate that will support a 765kV running corner tower.
    Aug. 10, 2022
    Traditional assumptions used for base plate and anchor bolt design must be reconsidered for lattice towers.
    Three-mast guyed deadend structure installation.
    Aug. 5, 2022
    Cost and performance do not respect traditional schemes when it comes to advantages.
    Full-scale test performed at EDM of ductile iron pole. Courtesy of McWane.
    Aug. 4, 2022
    Testing and evaluation is the best way to assure that structures and towers will survive a wildfire.
    Getty Images 1325916210
    Aug. 3, 2022
    After two-plus years of virtual meetings, webinars, and virtual conferences, I’ve always felt something was missing.
    Mississippi River crossing in progress. Courtesy of Entergy.
    Aug. 1, 2022
    Special transmission structures are needed by today’s interconnected power grid.

    More content from August 2022 Structures Supplement

    aydinmutlu/Getty Images
    Getty Images 637589830
    July 19, 2022
    There are a lot of companies outside of our industry that see the opportunities and are offering solutions when they don’t know a thing about the subject matter.