The station includes a bundle of meteorologic equipment, bidirectional cameras and multiple sensors to keep a close watch on transmission and distribution lines.
The waiver was received with the help of Skydio, a U.S. drone and software manufacturer, and authorizes operations through 2028, specific to Skydio drones.
Since the plan's inception, the lab has restored many high-voltage services, including lightning impulse (up to 1,400 kV), switching impulse (up to 900 kV), dry and wet power ...