Duke Energy is evaluating the use of a point to point digital secondary system to reduce the amount of copper utilized in traditional substation protection designs.
Bushing failures are the major causes of transformer failures. These leads can lead to costly consequences: oil spills, explosions, fires and the significant cost to replacing...
A multi-part series on what a job superintendent needs to know about the escalating use of horizontal directional drilling for undergrounding transmission and distribution lines...